Offshore & Marine Engineering Projects
Inspection Planning Philosophy.
Development of a general inspection planning procedure for fixed offshore steel structures, by joint consideration of all relevant types of hazards and deterioration modes. Consultancy in the implementation of the approach using Bayesian nets.
Position: Responsible for overall methodology and philosophy and for the development of RBI plans.
Client: Instituto Mexicano de Petroleo, Ciudad de Mexico, 2004-2005.
Bay
of
Campeche
Jacket Structures.
Service life assessment and extension study using risk based approaches for the fixed steel jacket structures in the Bay of Campeche, Mexico.
Position: Responsible for overall methodology and philosophy and for the development of RBI plans.
Client: Pemex, Ciudad del Carmen, Mexico, 2002-2004.
Decommissioning Risk Assessment.
Technical risk assessment for the" refloat" and "in-situ" decommissioning options for the concrete structures MCP01 on the Frigg field including
- structural reliability analysis - degradation assessment and modelling for the concrete structures - assessment of residual capacity of the concrete structures - operational risk analysis - cost benefit analysis using Bayesian networks Position: Expert consultant to COWI.
Client: Consultant to COWI working for Totalfinaelf,
Stavanger
,
Norway
, 2003.
Generic Risk Based Inspection Planning Field Implementation. Development and implementation of generic risk based fatigue crack growth inspection plans for all the Mærsk Olie og Gas fixed steel offshore platforms in the North-Sea.
Position: Project manager and lead engineer. Client: Mærsk Olie og Gas, Esbjerg, Denmark, 2001-2003.
Bongkot Jacket Structures. Development of risk based inspection (RBI) plans for all fixed steel jacket structures of the Bongkot oil production field.
Position: Expert consultant to Bureau Veritas,
Paris
,
France
. Client: Consultant to Bureau Veritas working for TotalFinaElf, Bangkok, Thailand, 2002-2003.
Chad
FSO RBI. Development of risk based inspection plans for the floating production and off-loading unit
Chad
. The RBI includes detailed inspection planning in regard to fatigue crack growth as well as corrosion.
Position: Expert consultant to Bureau Veritas,
Paris
,
France
.
Client: Consultant to Bureau Veritas working for ExxonMobil,
Surrey
, UK., 2001-2002.
Decommissioning Risk Assessment. Technical risk assessment for the" refloat" and "in-situ" decommissioning options for the concrete structures TCP2, TP1 and CDP1 on the Frigg field (Lead Engineer) including
- structural reliability analysis - degradation assessment and modelling for the concrete structures
- assessment of residual capacity of the concrete structures
- operational risk analysis - cost benefit analysis using Bayesian networks
Position: Project manager and lead engineer, 1999-2000. Expert consultant, 2000-2002.
Client: Consultant to Bureau Veritas working for TotalFinaElf, Stavanger, Norway, 2000-2002.
Jotun & Balder Risk Based Inspection Planning. Risk based inspection planning for the offshore installations on the Jotun and Balder fields (Esso Norge) including
static process equipment
FPSO ship hull structures jacket and topside structures
sub-sea satellites, flexible piping and risers Project responsible for the RBI for the process equipment and development of probabilistic models for the degradation of flexible pipelines based on failure rate statistics. Position: Project lead engineer.
Client: Employed by Det Norske Veritas working for Esso Norge, Stavanger, Norway, 1998-1999.
In-situ disposal of the Ekofisk Tank and Barrier structures. Responsible for the assessment of the future degradation and associated risks for the Ekofisk Barrier and Tank structures corresponding to different in-situ disposal and degradation mitigation options. Responsible for the development of economical risk models for the evaluation and comparison of the different disposal options.
Position: Responsible for reliability and risk assessments. Client: Employed by Det Norske Veritas working for Phillips Petroleum, Stavanger, Norway, 1998-1999.
Probabilistic Framework for RBI. Responsible for the development of a consistent probabilistic framework for the DNV software ORBIT-Offshore for RBI for process systems. This includes the development of a Bayesian methodology for the utilisation of inspection results in the inspection planning. Position: Project manager.
Client: Employed by Det Norske Veritas, Internal DNV development, Oslo, Norway, 1998-1999.
Inspection Philosophy Document, Formulation of inspection philosophy for the inspection planning for the South Arne offshore installation. Position: Lead engineer.
Client: Employed by Det Norske Veritas working for
Amarada Hess
,
Denmark
, 1998.
Management of Marine Fouling. Assessment of removal and design marine fouling profiles for fixed steel offshore structures in the North-Sea. Mærsk Oil and Gas, 1995.
Position: Project manager and lead engineer.
Client: Employed by COWI working for Mærsk Olie og Gas, Esbjerg, Denmark, 1994-1995.
Nohoch-B Offshore Production Platform. Inspection and maintenance planning of fixed steel offshore structures, using IMREL software. Assisting NDE-Techology, University College London in using the IMREL software for reliability and life cycle costs based inspection planning of Pemex structures in the
Gulf of Mexico. Position: Project lead engineer.
Client: Consultant to Instituto Mexicano de Petroleo, IMP, Mexico City, Mexico, 1993-1995.
|